House renovation cost calculator

Renovation is priced per square metre by the trade, so that is how this works. Set the floor area, how far you are going and the age of the building.

Last updated July 2026 · built by working UK builders

Renovation estimate
Internal floor area

A 3-bed 1930s semi is roughly 90 m². A 2-bed Victorian terrace is around 70 m². A 4-bed detached is 140 m²+.

How far are you going?
Age of the property

Older buildings need breathable materials, more making good, and more surprises behind the plaster.

Major items on top

These sit outside the per-m² rate because they either apply or they do not.

Will you be living there during the work?
Where is the property?

Labour rates and builder demand vary more than materials do.

If the property has been empty for two years or more, most of the work qualifies for the reduced 5% VAT rate rather than 20%. Very few homeowners claim it. Ask your builder before they price the job.

A 15% contingency on a renovation is not pessimism — on pre-war housing stock it is arithmetic.

The rates behind this calculator

All figures are 2026 UK prices for a competent, insured, VAT-registered contractor. Costs are shown as ranges because building work is delivered in ranges. A “×” value multiplies the whole build cost.

How far are you going?

OptionCostEffect on total
Cosmetic refresh
Decorate, floors, new kitchen and bathroom, nothing structural — £450–£750/m²
£450–£750 per m²Added
Full refurbishment
Rewire, re-plumb, re-plaster, new kitchen and bathrooms — £1,000–£1,700/m²
£1,000–£1,700 per m²Added
Back to brick
Strip to the shell, new floors, structural work, everything new — £1,700–£2,700/m²
£1,700–£2,700 per m²Added
Derelict / uninhabitable
Roof, structure, damp, the lot — £2,300–£3,600/m²
£2,300–£3,600 per m²Added

Age of the property

Older buildings need breathable materials, more making good, and more surprises behind the plaster.

OptionCostEffect on total
Pre-1919 (solid wall, lime plaster)×1.15
1919–1945×1.05
1945–1980×1
1980 onwards×0.93
Listed or in a conservation area×1.35

Major items on top

These sit outside the per-m² rate because they either apply or they do not.

OptionCostEffect on total
New roof covering£8,000–£22,000Added
New boiler and full central heating system£5,500–£12,000Added
All new windows and external doors£7,000–£25,000Added
Damp-proofing and replastering to affected walls£2,500–£9,000Added
Structural work — beams, underpinning, wall removal£6,000–£30,000Added
Single-storey extension included£40,000–£80,000Added
Loft conversion included£45,000–£75,000Added
Insulation upgrade — walls, loft, floors£4,000–£18,000Added
Drainage renewal£2,500–£9,000Added
Landscaping and driveway£4,000–£20,000Added
Asbestos survey and removal£800–£6,000Added

Will you be living there during the work?

OptionCostEffect on total
No — empty property×1
Yes, living in it
Slower, phased, more protection
×1.18

Where is the property?

Labour rates and builder demand vary more than materials do.

OptionCostEffect on total
London×1.25
South East×1.12
South West×1.03
East of England×1.03
Midlands×0.97
North of England×0.92
Wales×0.92
Scotland×0.95
Northern Ireland×0.85

Applied to every total

ItemAmount
Design, engineer & building control5–10% of build cost
Contingency15% of build cost
VATIncluded at 20% unless stated

The four levels, honestly described

Cosmetic refresh — £450 to £750 per m²

Nothing structural, nothing behind the plaster. New kitchen and bathroom, floors, doors, decoration, maybe new radiators. The house looks transformed and is fundamentally unchanged. Fine if the wiring, heating and roof are sound — and a mistake if they are not, because you will be pulling that new plaster off in three years.

Full refurbishment — £1,000 to £1,700 per m²

Rewire, re-plumb, new heating, re-plaster throughout, new kitchen and bathrooms, new joinery and decoration. The building fabric stays; everything in it is renewed. This is the sensible default for a 1930s–1970s house that has not been touched since the eighties.

Back to brick — £1,700 to £2,700 per m²

Strip to the shell. New floors, structural alterations, insulation, sometimes new windows and roof. You are effectively building a new house inside an old envelope, which is why the cost approaches new-build rates.

Derelict — £2,300 to £3,600 per m²

Roof off or failing, no services, structural movement, damp throughout. Every trade starts from nothing and works around a building that fights back. Budget generously and get a structural engineer involved before you buy, not after.

Sequence matters more than anything else

The most expensive mistake in renovation is doing things in the wrong order. Plaster before the roof is fixed. Floors before the heating is finished. Decoration before the building has dried. Every one of those means paying twice for the same work.

The correct order is boring and rarely followed: watertight, then structural, then strip out, then first fix, then plaster, then dry, then second fix, then decorate.Drying is a real programme item — a re-plastered pre-war house needs weeks, not days, and forcing it with heat causes cracking.

What to check before you buy a renovation project

  • Roof and gutters — the source of most other problems in the building.
  • Signs of movement — diagonal cracking, sticking doors, sloping floors.
  • Wiring type — rubber or lead-sheathed cable means a certain full rewire.
  • Damp — and whether it is rising, penetrating or condensation, because the three cost wildly different amounts.
  • Asbestos — artex, floor tiles, soffits, flue pipes. Common pre-2000 and expensive to discover late.
  • Drains — a CCTV survey costs a couple of hundred pounds and can save five figures.
  • Planning history — unpermitted work you inherit becomes your problem.

The VAT point almost nobody uses

If the property has stood empty for two years or more, the reduced 5% VAT rate applies to most of the renovation work. On a six-figure project the saving runs to five figures. The builder must apply the rate at invoice stage, so it has to be agreed before pricing — and you need evidence of the empty period, usually a letter from the council's empty property officer.

Frequently asked questions

How much does it cost to renovate a house in the UK in 2026?

A cosmetic refresh runs £450–£750 per m². A full refurbishment with rewire, re-plumb, re-plaster, new kitchen and bathrooms is £1,000–£1,700 per m². Back-to-brick is £1,700–£2,700 per m², and a derelict property can exceed £3,500 per m². On a typical 90m² three-bed semi that means roughly £45,000 for a refresh and £110,000–£170,000 for a full refurbishment.

Can I claim the reduced 5% VAT rate?

If the property has been empty for two years or more immediately before work starts, most renovation work qualifies for 5% VAT instead of 20%. On a £120,000 renovation that is around £15,000. Your builder has to apply the rate — you cannot reclaim it yourself — so raise it before they price the job, and be ready to evidence the empty period with council tax or electoral roll records.

What order should renovation work happen in?

Make it watertight and structurally sound first — roof, gutters, damp, structural repairs. Then strip out, then first fix electrics and plumbing, then plastering and drying time, then joinery and second fix, then decoration and floors last. Doing anything decorative before the building is dry is money you will spend twice.

How much contingency do I need?

15% on any pre-war property, and 20% if it has been empty or neglected. Renovation contingency is not padding — it is the budget line for the things nobody could see until the plaster came off, and on older housing stock there is always something.

Is it cheaper to renovate or extend?

Per square metre, renovating existing space is usually cheaper than building new space. But renovating does not add floor area, and floor area is what valuers pay for. The best-value projects normally combine a modest extension with a full refurbishment of what is already there, done in one visit rather than two.

Viewing a property or putting in an offer?

Get a builder’s eyes on it first. We review listings, photos, surveys and reports so you know exactly what you’re walking into.

Get a builder’s property review — £59

Response within 24 hours · no-quibble money-back guarantee

Get a builder’s property review — £59